Marmaray Project Fiber Optic Cable Work | Sette Yapı

Marmaray Project Fiber Optic Cable Work

MARMARAY PROJECT FIBER OPTIC CABLE WORKS
  • 5.4 km 288 Core F / O for 13.6 km including twin-track deck tunnel crossing the Bosphorus under the sea. Cable laying and finishing operations are done by us.
  • Fiber optic works in the Marmaray tunnel have been carried out in accordance with TCDD standards.